Zion Chapel School Onsite Sewage Rehabilitation
BenBeck II, Inc was awarded the contract by the Coffee County Board of Education for remediation of failing disposal system at Zion Chapel School.
Designed by Wiregrass Engineering Technology, LLC, the scope of work required installation of a 10,000 gallon effluent storage tank, lift station with controls, 4500 LF of force main and 3800 LF of E-Z Flow effluent disposal line with distribution boxes and lines.
System is monitored and reported to ADPH on a regular schedule.